Pedestrian Crossing

The east side of the bridge is now open to pedestrians and cyclists!

Pedestrians and cyclists have been moved over from the temporary walkway on the west side to the new bridge on the completed east side.

The temporary pedestrian crossing on the west side of the bridge has been removed. Next, the work bridge beside it will also be removed so that the railings and sidewalk/bike lane can be completed on the west side of the bridge.

Pic (20)

Advertisements