Construction Progress (2 of 2)

The east side of the bridge is complete and open to pedestrians and cyclists! Work continues on the west side of the bridge. The bridge is scheduled to open to vehicle traffic in mid-May with the final completion in June. Here’s another set of pictures that shows the latest progress (newest to oldest):

Installing the first banner on a street light pole.
2014 05 07 Pic 6

Installing railings on the west side of the bridge.
2014 05 07 Pic 5

Installing pedestrian and cyclist symbols on east side.
2014 05 07 Pic 4

Removing the remainder of the temporary work bridge.
2014 05 07 Pic 3

Removing the temporary walkway on the west side of the bridge.
Pic (21)

Installing green bike lane on Admirals Road south of the bridge.
Pic (22)

The new bridge: looking west.
2014 05 07 Pic (2)

East side of bridge open to pedestrians and cyclists.
2014 05 07 Pic 1

Pedestrians and cyclists have now been moved over from the temporary walkway on the west side to the new bridge on the completed east side.
Pic (20)

East side of bridge complete!
Pic (19)

Installing handrail and cabling on the east side of the bridge.
Pic (18)

Installing lines on the new pavement on Admirals Road south of the bridge.
Pic (17)

Landscaping on Admirals Road at north end of bridge complete.
Pic (16)

Installing the first street light on the crash barrier on the east side of the bridge.
Pic (15)

Paving the second layer of asphalt on Admirals Road south of the bridge.
Pic (14)

Pouring the coloured concrete for the bike lane on the east side of the bridge.
Pic (13)