Construction Progress (1 of 2)

Lots of progress has been made on the project! Below is the first set of some pictures that show what crews have been up to in the last few weeks (newest to oldest):

Installing the utility infrastructure under the bridge.
Pic (12)

Starting the installation of the posts for the railing on the east side of the bridge.
Pic (11)

Paving the first layer of asphalt on Admirals Road south of the bridge.
Pic (10)

Preparing Admirals Road south of the bridge for pavement.
Pic (9)

The deck sidewalk on the east side of the bridge complete.
Pic (8)

Pouring the concrete for the deck sidewalk on the east side of the bridge.
Pic (7)

The reinforcing steel for sidewalk and bike lane on the east side of bridge is complete.
Pic (6)

The electrical wiring for the bridge lighting in the crash barrier on the west side of the bridge is completed.
Pic (5)

Installing railing along the back of sidewalk on the southeast end of the bridge.
Pic (4)

Landscaping is in place on Admirals Road south of Gorge Road.
Pic (3)

The sidewalks and stamped concrete work is almost complete on Admirals Road north of the bridge; pedestrian crosswalk beacons are installed.
Pic (2)

Crews working on landscaping on Admirals Road north of the bridge.
Pic (1)